I was really gleeful when our business started construction on a new building.
For weeks, our coworkers as well as I watched the construction process.
The people I was with and I were super eager to transport into our new building. The new office space is located right downtown as well as just gorgeous. It’s equipped with all of the most new amenities, including automatic lights, touchless faucets as well as keyless door locks. However, the entire staff has some complaints. Because of the location of the building, every one of us deal with heavy traffic on our way to as well as from work. There is also particularly limited parking. The people I was with and I are forced to pay to use a parking garage more than 2 blocks away as well as then walk through rain, snow, heat, humidity as well as all sorts of weather conditions. The building is constructed almost entirely of glass, which is attractive as well as provides an amazing view however makes the toiling environment overheated in the summer time as well as freezing in the winter. Despite the tinted as well as thermal paned glass, the temperature of the glass makes a difference. While the building is outfitted with a state-of-the-art heating as well as cooling system, every one of us have no control over the temperature. The plan is set to automatically switch from heating to cooling on a identifiable date on the calendar, however even if the outside conditions are overheated as well as sticky at the end of October, the heating plan starts up as well as blasts us with overheated air. My coworkers as well as I are occasionally dressed in shorts in September. Sometimes the weather is still freezing as well as snowy in May, however our plan has switched to a/c as well as the building is cold.